Tuesday, December 7, 2010

electrical and plumbing beginning

This week the plumbers and electricians are starting. Of course that meant walking through with each group for hours.... and it was 20 degrees... so very cold! It will be nice to get some insulation in this joint, but that is weeks away!

I had to give the electrical guy the disclaimer that he is dealing with a crazy person here.... he seemed fine with all of my craziness, so that is very good news. Of course who knows what I told them, it was so darn cold I can't remember!

They also put the cupola on top... it needs the weathervane still, but I suppose that will go on at the very end. I feel sorry for the electrician, because he is tasked with figuring out how the heck to get a light in there --- and a way to change the bulb....yikes!

Here are a few pics from the week....





garage details and cupola:


Barrel vault in the breakfast room:


The porch passed inspection, so the concrete should be poured on the porches any day now. After the concrete is poured, then the round porch can be framed. I've almost forgotten about that area, but it will be great to see.

The cabinet guy came and we marked out all of the cabinets on the floor. That was frustrating because he took all of the field measurements from our meeting and then went back to "finalize," but he applied the field measurements to an old design. That entailed hours of reconciliation for me, and I hope he gets it right on the next pass!

I have been working on the lighting plan and am finding that it is very hard to size lights --- especially exterior ones. I cut out pieces of cardboard to represent the sizes and that was totally useless. I finally went to the lighting store and brought one home with me (of the larger size). It seemed huge in isolation, but the electrician, Lloyd and I all think it is the right size. We'll see....

Other happenings, the guys fixed the header at the breakfast room (raised it, and it looks great), they made a bench in the master shower and are finalizing the basement framing (that was the warmest place in the house today)!

Coming up.... siding, stone, roofing and Nick will be working on the audio in the next few weeks.